El Dorado Hills
Preparing the windowed shower
The original work photograph shows the bare base and prepared walls at the glass-block window. We installed the Schluter heating system in the floor and continued it through the curbless entry into the shower pan.
Matching the main floor to the pan
The 12-by-24-inch gray tile carries through the entry and into the shower. The recess below the window breaks the wall into two fields, and the glass is set where it meets the continuous tiled floor.
Turning the relief at the corner
Large-format relief tile runs behind the dark hand shower. We mitered the exposed edges so the horizontal texture could turn around the corner without a metal strip. Matching tile baseboard continues outside the shower.