Bathroom Remodeling

MI TILE / COMPLETE BATHROOM REMODELING

A better morning.
A bathroom made for you.

A room that works beautifully starts long before the tile. We bring the layout, selections, preparation and finishing into one coordinated plan—so you understand the decisions before the work begins.

Explore the processPlan your preliminary budgetCompare estimates
After: ceiling-height glass shower with a curbless entryBefore: glass-block partition and corner bathtubBeforeAfter
Clear glass, blue-green tile and a continuous floor transition open the space.24 × 48 tile · 45° mitered edges · curbless entry · ceiling-height custom glass.Drag to compare before and after.

MORE OPEN. MORE CONNECTED.

A seamless step into a different kind of bathroom.

A once-crowded arrangement gives way to a lighter, more open shower. The main floor flows into the shower without a raised curb, while ceiling-height custom glass keeps the room visually connected.

Green 24 × 48 wall tile, a tiled shower ceiling and carefully mitered 45° edges bring the surfaces together. The result comes from planning the floor levels, drainage, tile layout and glass as one design.

We also made more room around the toilet, where the door previously opened and closed almost against it. Removing the bulky tiled surround and installing a freestanding bathtub opened up the room while keeping the same bathtub size.

START WITH EVERYDAY LIFE

What should feel different in your room?

An easier entry? More storage? Better light? We help translate what feels awkward today into decisions about layout, materials and construction.

Explore this project & client story

01 / YOUR STARTING POINT

One bathroom. More than one way forward.

REFRESH

Keep what works

Keep a practical layout and focus on the shower, surfaces and fixtures that need attention. We define what stays before pricing what changes.

REIMAGINE

Change how the room works

A new layout, tub-to-shower conversion or curbless entry needs early coordination of floor levels, plumbing and product choices.

CONTINUE

Join at your current stage

Already started? We review existing work and available records, then define what can be retained and what remains before taking on the next stage.

02 / YOUR PROJECT ROADMAP

Know what happens next.
And why it comes first.

Discover & measure

Discuss how you use the room, document existing conditions and confirm the scope, access and priorities.

Resolve the design

Choose layout, fixtures and important dimensions. Plan niches, lighting, glass and storage together before closing walls.

Confirm scope & readiness

Separate labor, installation supplies, owner-selected products and optional work. Confirm deliveries, responsibilities and the work sequence.

Protect, open & prepare

Protect adjacent spaces, perform agreed demolition and review exposed conditions. Hidden damage or changed work is discussed before proceeding.

Build the hidden layers

Coordinate framing, plumbing, electrical, substrate preparation and waterproofing. Document relevant stages before they are covered; coordinate required inspections and agreed testing.

Install, finish & walk through

Tile installation, grouting and silicone are distinct priced stages. Complete agreed fixtures and finishes, review remaining items and organize project records.

This is a typical sequence. Permits, access, product lead times and the final scope determine your schedule.

THE WORK YOU WILL NOT SEE

Confidence starts behind the tile.

Preparation, waterproofing and connections deserve the same care as the finished surface. Photos and video of relevant stages help explain the work now and support future maintenance.

Your project record

Keep progress photos, agreed changes, product information and available test or inspection records together. Ask questions while the relevant work is still accessible.

Learn what to check before tileNeed a second opinion?

03 / UNDERSTAND YOUR BUDGET

Choose the changes.
Understand their impact.

LAYOUT

Same connection or a new location?

Replacing a fixture is different from moving a toilet or routing a new electrical circuit. Access through floors and walls changes the scope.

SHOWER

Curbed, curbless or tub-to-shower?

Floor height, drain location and waterproofing must work together. A flush entry is a construction decision as well as a visual one.

SURFACES

Quiet simplicity or intricate detail?

Tile size, pattern, stone, niches and 45° edges affect preparation, cutting and finishing. Compare these choices before ordering.

FINISHES

Ready-made or made to fit?

Custom glass, cabinets and countertops have different budgets and lead times. Dimensions must coordinate with the finished room.

Four clear parts of a proposal

Labor
The agreed work, itemized by stage.

Installation supplies
Backing, waterproofing and other installation materials, accounted for separately.

Your finish products
Tile, fixtures, vanity and other selections you purchase.

Optional or unresolved work
Upgrades, allowances and conditions still to confirm.

The calculator is a planning tool. Unpriced or unselected work is not free and is not silently included. The final proposal follows scope review.

04 / DETAILS WITH A PURPOSE

Pick what matters to you.

Warm tile underfoot

Floor heating adds everyday comfort. The heated area, electrical connection, thermostat, installation system and product requirements must be planned together. Supplies and labor are separate.

Epoxy grout

An option where stain resistance and ease of maintenance matter. It requires different installation handling. Your current labor allowance is three times standard grout; suitability depends on the product and surface.

45° mitered edges

Tile edges meet at a carefully cut corner for a continuous finish instead of a visible trim profile. This adds fabrication and finishing work; tile suitability and edge durability need consideration.

Niches, benches & lighting

These make a shower more usable when the placement fits your daily routine. Resolve dimensions, framing, waterproofing and any electrical needs before tile starts.

05 / READY BEFORE THE CREW ARRIVES

A smooth project starts with what is on site.

Products ready for installation

Confirm required valve rough-ins and matching trim, drains, tile, vanity, fixtures and other products in your scope. Delivered, checked and complete matters more than simply ordered.

Large-format tile needs at least a 25% planning allowance for cuts and spares under our current estimating approach. Pattern, layout and product packaging can require more; confirm quantities before purchase.

A space ready for work

Clear personal belongings, access routes and the agreed staging area. Plan how the household will manage while this bathroom is unavailable. Tell us about access restrictions before scheduling.

Your calculator checklist changes with your scope. A full bathroom checklist should not be the same as a backsplash checklist.

QUESTIONS BEFORE YOU START

Clear expectations make better projects.

Do I need to know every product before contacting you?

No. Photos, approximate dimensions and priorities are enough to start a useful conversation. Product models and critical dimensions need to be confirmed before the relevant work begins.

Can you help with design and selections?

Yes. Layouts, drawings, visualizations, material selection and agreed design support can be scoped through Mi Tile. Design is a separate service with defined deliverables.

What if demolition reveals damage?

We review exposed conditions, explain the effect on scope and discuss the required change. Concealed repairs are not automatically included in a preliminary calculator total.

YOUR NEXT STEP

Start with your room.
Build a clearer plan.

Use the bathroom calculator below, or send wide photos, your city and what you would like to change. The result is a starting conversation—not pressure to know everything today.

Open the bathroom calculatorSend photos & priorities
Estimate your bathroomOpen the calculator when you are ready. Only details for this service.

YOUR PROJECT / PRELIMINARY ESTIMATE

Your project. A clearer starting price.

Start with the details you know. See a preliminary price range for the work entered, what is still missing, and the photos that will help refine your estimate.

Try an example. Make it yours.

Choose a starting project to see an itemized budget instantly. Loading an example replaces project settings; Undo restores your previous entries. Your city and notes stay in place.

Illustrative scenarios based on Mi Tile work. Dimensions and product budgets are examples, not a customer quote or a promise of final cost.

Preliminary budgetAdd known detailsView estimate ↓

1. Where are you starting?

2. Plumbing & electrical changes

Starts with one selected fixture or limited work area. More detail lets you change quantities; saved quantities stay active in either view. If a related trade is checked below, unspecified work uses a stated planning assumption. Explicit “No work” takes priority.

3. Surfaces, tile & installation

Enter square feet or length × width for each surface. Measure the bathroom floor outside the shower separately. A new shower pan starts at 15 sq ft.

Tile quantities automatically include 20% spare for standard tile or 25% for large-format tile or complex patterns.

Labor uses installed area only. Cutting allowance and whole-box rounding apply only to the tile purchase. Already-tiled surfaces are excluded. Grouting and silicone are separate labor stages, itemized below. Supplies appear as a separate budget allowance.

The quantities above cover selected finish tile. The live estimate itemizes labor, installation supplies and selected additional work separately. Final measurements and carton quantities need review before ordering.

A continuous tile edge around the corner.

Details about mitered edges

Two tile edges are cut at 45° and joined at an outside corner, so the tile appears to wrap around it without a visible metal trim. A clean detail for niches, benches and fireplaces. Tile suitability and exposed corner protection are reviewed first.

Priced per linear foot of finished edge; enter only the edges you want mitered.

Built-in storage, with less clutter in the shower.

Details about shower niches

A recessed niche keeps everyday bottles within reach and leaves the shower floor clear. We plan its height and size around your products, tile layout and wall framing. Custom sizes and lighting are separate choices.

This quantity is for building, waterproofing and tiling a standard niche. Use the prepared-niche field if it is already built.

Enter each niche once. Its interior is included in the niche allowance.

2. What affects your project?

Choose what you know. “Not sure” is a useful answer too.

A more open shower entrance with a curbless option.

Details about shower bases

A curbless shower removes the raised threshold for a more continuous floor and easier entry. The floor structure, slope, drainage and surrounding waterproofing need to support the design. We confirm feasibility before promising a flush transition.

Choose curbless conversion when wanted. Base construction, tile installation and glass remain separate estimate lines.

Glass sized to fit the shower you designed.

Details about shower glass

A custom enclosure is measured for the finished opening, giving more flexibility in size and layout than a store-bought kit. Panel arrangement, hardware and height affect the final price. Final glass measurements follow completed tile.

Custom packages include glass, fabrication and installation. For a store-bought kit, the product price and installation are separate.

Related work you want Mi Tile to coordinate

Warm tile under bare feet, right where you step.

Details about heated floors

Think of stepping onto a comfortably warm bathroom floor on a cool morning. Electric floor warming adds comfort to selected walking areas, with temperature controlled by a compatible thermostat. The usable area and electrical supply are checked before installation.

Select Heated floors to include it. Enter the heated area in the detailed settings; the thermostat / testing stage and system materials are shown separately.

Complete the scope · fixtures, glass & materials

Choose known work. “From selected details” follows the answers and checked trades. Quantities below count remaining work; 0 means not requested. Open Assumptions beside the total to see any defaults used.

Straighter surfaces help the finished room look intentional.

Details about wall preparation

Correcting uneven walls can improve tile alignment and the transitions to adjoining painted surfaces. The amount of correction depends on the existing room; it is a separate service chosen after reviewing the surfaces.

Shower-wall correction and whole-room correction are different options. Select only the scope you need.

Epoxy option: more resistance to everyday stains.

Details about epoxy grout

High-performance epoxy grout offers strong stain resistance and consistent color, helping joints stay easier to maintain. It still needs routine cleaning, and compatibility should be checked with your tile or stone. It does not replace the shower waterproofing system.

Epoxy grout labor is 3× standard grouting; grout material is separate. Natural-stone grouting uses 1.5×. Contrast-color premiums are confirmed separately.

Fixture quantities & finishing lengths

Warm the places you actually stand and walk.

Details about heated area

Plan the clear walking area beside the vanity and outside the shower. Fixed cabinets, tubs and other excluded zones should not be counted automatically. Mi Tile confirms the cable layout and compatible system.

The estimate separates heated-area labor, thermostat installation / testing, materials and any new electrical circuit.

Finish an existing niche to match the surrounding tile.

Details about prepared niches

Careful layout inside an already-built niche makes its sides, back and edges work with the shower design. The existing preparation and waterproofing must be suitable to continue.

This option is tile labor for a prepared niche. Do not also count the same niche as a new niche to build.

A clean drain line that can suit your shower layout.

Details about linear drains

A linear drain creates a long, defined drainage detail and can support different tile and slope layouts when designed for the location. Drain placement, waterproofing connection and the selected product need to work together.

The upgrade labor is separate; drain product and any additional plumbing changes must also be included.

A comfortable place to sit or rest a foot.

Details about shower benches

A tiled bench adds a convenient seat for showering and everyday routines. Its size and position should leave enough room to move, with appropriate support, slope and waterproofing.

The standard bench allowance includes building, waterproofing and tiling. Finish tile and unusual sizes are reviewed separately.

Carry the tile finish neatly into the window opening.

Details about window returns

Tiled window returns can make the opening feel integrated with the surrounding wall. Edge treatment, frame compatibility and wet-area waterproofing are planned before installation.

The allowance covers a standard opening; larger or unusual windows need their own review.

Light that highlights the details you chose.

Details about lighting

Accent lighting can bring attention to a niche, shelf or textured surface and create a softer evening atmosphere. Driver location, controls, access and fixtures suitable for the location are planned before closing the wall.

Installation is priced by lighting point. Fixtures, drivers and additional wiring are separate unless entered.

4. Anything else we should know?

BEFORE YOU COMPARE THE TOTALS

Do the estimates cover the same project?

See what each proposal includes, what it leaves out and which costs still need clarification.

Compare my estimates

Estimate comparison checklist

Areas and quantities
Are the shower walls, shower pan and bathroom floor measured separately? Check niches, benches and exposed edges as well.
Preparation and waterproofing
Compare demolition, haul-away, substrate preparation, waterproofing, drainage and testing.
Fixtures and finishes
Who supplies and installs each valve, fixture, tile, vanity, countertop and glass panel? Check what happens if plumbing or wiring moves.
Allowances and changes
Mark each item as included, an allowance, excluded or unclear. Ask how changes affect the price and schedule.