Kitchen Remodeling

MI TILE · Kitchen remodeling · Greater Sacramento

You should not have to solve
the whole kitchen alone.

A sink changes a cabinet. An appliance changes the layout. A slab changes the seam plan. We help put those decisions in order, so your kitchen can move from a collection of ideas to a coordinated project.

01 / Keep what works

Not every kitchen needs
the same kind of remodel.

Start with what frustrates you in daily use: storage, circulation, lighting, worn finishes or a layout that no longer fits.

REFRESH

You like the layout

Focus on selected surfaces, backsplash, lighting or suitable cabinet refinishing. Check the condition of what stays before investing in the finish.

RECONFIGURE

Some parts work.
Others do not.

Explore an island change, better storage, selected cabinet modifications or a different appliance arrangement. Map the consequences before buying.

REBUILD

The room needs
a new plan

Coordinate layout, cabinets, utilities, surfaces and finishes together. Structural or permit-related work is identified as its own scope where applicable.

Completed kitchen with tile walls, cabinetry and countertops
Cabinet lines, appliances, countertops and tile are coordinated as one room.

02 / Turn preferences into a plan

Beautiful is easier to choose
when the practical questions are settled.

Where does the microwave go if the range gets a hood? Will the new sink fit the cabinet you want to keep?

These are not small installation questions to leave for the crew. They decide what can stay, what must change and how much the project will cost.

We work through your priorities and product requirements before one purchase forces three unplanned changes.

03 / One decision affects the next

Buy with a plan.
Not with a return trip in mind.

01

Sink · cabinet · countertop

Confirm sink dimensions, mounting style and the cabinet’s available space. An apron-front sink may require a suitable cabinet modification or replacement before the countertop is fabricated.

02

Appliances · clearances · utilities

Use the actual model specifications. Door swings, ventilation, power, water and cabinet openings need to fit the same plan.

03

Slabs · fabrication · seams

Confirm the slab size, quantity, layout and edge details with the fabricator before committing to a particular slab. A showroom selection is only one part of the countertop decision.

04

Lighting · tile · daily use

Plan task lighting and controls before the backsplash closes the wall. Review finishes together so the cabinet color, counter, tile and light tell the same story.

SELECTIONS THAT HAVE CONSEQUENCES

One small change can
move several trades.

A new sink or faucet

Confirm sink dimensions, cabinet fit, faucet holes, accessories and plumbing before countertop fabrication. A product photo alone is not a specification.

A thicker backsplash or slab

Review outlet and switch depth, exposed edges, window returns and appliance clearances. Decide where the material ends before it is cut.

A waterfall edge or feature wall

Plan seams, veining direction, supports and the relationship to stools, cabinet doors and receptacles. A beautiful slab still needs a workable layout.

A new wall finish or lighting effect

Complete planned wiring and fixture locations before decorative finish work. Test the sample under the actual light; grazing light reveals surface variation.

Our selection checkpoint: a product list with models, sizes, finishes, approved samples, ordering responsibility and delivery status. You make the meaningful choices; we help put them in the right order.

04 / Less uncertainty at home

The worries behind
“How long will it take?”

We cannot be without a kitchen indefinitely

Agree the work sequence and what must be ready before demolition. Discuss a temporary food-preparation area, access and which services will be interrupted.

We keep choosing things, but the project is not moving

Create a selection list with product links, quantities, decisions still open and who needs to approve each item. Resolve dependencies in order instead of shopping for everything at once.

We are afraid the budget will keep growing

Separate the base scope from options, allowances and unknown conditions. Explain changes before work proceeds, including the impact on related trades and finishes.

We do not know which decisions matter most

Start with function, layout and the items that affect construction. Decorative choices become easier when the cabinet, appliance and lighting plan is settled.

Nobody seems responsible for the whole room

Define who handles each part of the project, who confirms dimensions and who coordinates the handoffs. A countertop, cabinet and tile crew should not each be working from a different assumption.

05 / From idea to installation

A sequence that keeps
the project moving.

1. Understand the room and your priorities

Measure, identify what stays and decide what needs to work differently.

2. Coordinate the plan and selections

Connect layout, product specifications, finishes and trade requirements.

3. Confirm scope, budget and readiness

Review exclusions and options. Check delivery dates and the items needed before each stage begins.

4. Build in the agreed order

Coordinate preparation, utilities, cabinetry, fabrication, tile and final details.

5. Review the finished room

Walk through the agreed scope, remaining items and care information together.

The readiness check

“Ordered” is not the same
as “ready for installation.”

  • Dimensions confirmedAppliance, sink and fixture models match the plan.
  • Critical items received and checkedMissing or damaged products are identified before they stop the crew.
  • Fabrication coordinatedTemplates, measurements and installation sequence are agreed with the responsible parties.
  • Decisions recordedFinish colors, edge profiles, grout, hardware and lighting details are clear.
  • The home preparedCabinets are emptied, access is clear and protection and temporary use are planned.

06 / Your budget, in parts

A kitchen total should explain itself.

Design, demolition, cabinetry, countertops, plumbing, electrical work, flooring, backsplash, painting and appliance installation can all be separate parts of the scope. Finish products and installation supplies are tracked separately.

Can we keep the existing cabinets?

Possibly. We review condition, layout, construction and whether the new sink, counter or appliances are compatible. Keeping cabinets can make sense, but the required modifications should be priced before assuming it is the least expensive route.

Can you help us choose without making the process overwhelming?

Yes. We narrow choices around the room, budget and priorities, then work through the decisions in a useful order. Design support can include layout, drawings, finish selections and coordinated shopping; the exact deliverables are defined for your project.

Should we buy appliances and slabs first?

Select the intended products early, but confirm fit, specifications and the fabrication plan before purchasing. An attractive sale does not help if the product forces a cabinet change or does not fit the room.

What does the calculator tell us?

It helps organize the selected work into a preliminary budget. Custom cabinetry, fabrication, structural changes and concealed conditions may need individual pricing. The next step is to turn the entered scope and remaining questions into a written proposal.

Explore the technical guides behind these decisions

Product-specific instructions determine the final assembly. These references explain the planning principles shown above.

BEFORE YOU BUY

A tile you love.
A batch that works.

Send us the tile models you like. We help check the practical details before you commit: the actual batch, available quantity, edge condition and suitability for the location.

Read more than the product name

Keep the carton label.

Product / SKU
The selected model
Shade / dye lot
Compare across cartons
Caliber / size code
Confirm a match
Production lot
Check batch availability

Label names vary by manufacturer. A changed code is a reason to ask before mixing boxes.

  1. Check the actual tile

    Review samples from the batch: dimensions, squareness, bowing, thickness, visible chips and the cut edge. Compare concerns with the manufacturer’s stated tolerances.

  2. Reserve enough together

    Confirm usable stock from a consistent shade and caliber, including the agreed cutting allowance and spare tiles. A matching product name does not guarantee a matching batch.

  3. Protect it on the way home

    Look for sound cartons and protected edges. Corner guards are helpful when supplied. Record transit damage and inspect delivered tile again before installation.

Variation or a problem? Know what you are looking at.

Some tiles are deliberately varied in tone, pattern or texture. We review several pieces together and blend approved cartons during installation. Caliber differences, excessive distortion or damage need a separate decision before the tile is installed.

Rectified tile still has manufacturing tolerances. Leveling clips cannot make an unsuitable batch flat, and shipping damage should not be confused with factory warpage. We use the product’s instructions to agree the layout, joint width and an acceptable sample.

What to send the Mi Team

Send the product link, size and finish; photographs of carton labels; the room and intended surface; and any edge trim you are considering. We review the selection and coordinate a store or batch check as part of the agreed project planning.

Keep labels, receipts and a few spare tiles. Report damage promptly and resolve questionable pieces with the supplier before setting them.

FINISH THE EDGE

Choose the corner before
ordering the tile.

01 / Metal profile

A clean, protected edge

Choose the profile depth for the tile and setting system. Coordinate the finish with faucets, hardware or the tile itself.

Standard installation labor is normally included. The selected profile material is purchased separately.

02 / Tile baseboards

Continue the floor tile up the wall

Installation is $25 per linear foot when the baseboard is cut from the floor tile. Other tile, heights or custom profiles are quoted separately. Materials are purchased separately.

03 / 45° miter

The tile turns the corner

Two carefully finished edges create a continuous return. Tile composition, the exposed edge and impact risk guide whether a miter is appropriate.

Miter work is a separate allowance. Measure each finished edge once.

04 / Finished stone edge

Sometimes the material is the finish

Suitable marble or granite can be honed or polished at the exposed edge. Agree the edge profile and a sample; a raw cut is not automatically a finished edge.

Color-body porcelain does not necessarily carry its surface pattern through the body. Check the actual cut before choosing an exposed edge.

Tile baseboards are a separate finish option with their own measured scope. Installation from the same floor tile is $25 per linear foot. Other materials or profiles require a separate quote.

THE SMALL DETAILS THAT CHANGE THE FINISH

The tile adds thickness.
The outlets need a plan.

The device must sit firmly.

Adding tile changes the distance to the electrical box. The device must be supported at the finished surface, and the box setback and enclosure must remain suitable.

A listed box extender or other approved support may be needed. Longer screws alone do not correct every recessed-box or support problem.

We coordinate safe release and reinstallation of existing devices before tiling, so cuts fit the device and the cover closes neatly. Electrical handling is performed with the circuit safely isolated and verified.

Know the allowance

$15 per existing outlet

Extra labor to release and resecure an existing, serviceable outlet for backsplash tiling. Enter the number of devices in the estimate.

Replacement parts, box corrections, rewiring, relocation, new circuits and required electrical upgrades are separate. Do not count device handling again if it is already included in another electrical scope.

You can arrange this work in advance with a qualified person. Confirm that arrangement with us before arrival so it is not charged twice.

KEEP THE USEFUL PART

Kitchen remodel planning checklist

Save this list for your project or share it with your contractor. No sign-up needed.

  • Start with the daily problem: storage, lighting, work flow, appliance fit or worn surfaces.
  • Confirm cabinet drawings, finished levels, appliance specifications and door clearances.
  • Coordinate utilities and required inspections before closing walls or setting cabinets.
  • Agree countertop templating, support, sink cutouts and the installation sequence.
  • Confirm floor preparation, finished height and transitions before choosing the final flooring.
  • Check tile SKU, shade, caliber, batch quantity and quality before committing to the order.
  • Review backsplash layout, exposed edges, outlet support and flexible countertop joints.
  • Confirm any tile baseboard or outlet-handling allowance without duplicating other trade charges.
  • Approve finish samples in the room and assign responsibility for every purchase.
  • Plan a temporary kitchen, protection, delivery dates and written change approvals.

A clear next step

Start with what is not working
in your kitchen.

Send the room as it is and the changes you hope to make. You do not need a finished design to begin—we can help identify the decisions that unlock the next stage.

Helpful to send: wide photos from each corner, rough dimensions, what you want to keep, your main frustrations and any product or inspiration links.

Estimate your kitchenOpen the calculator when you are ready. Only details for this service.

YOUR PROJECT / PRELIMINARY ESTIMATE

Your project. A clearer starting price.

Start with the details you know. See a preliminary price range for the work entered, what is still missing, and the photos that will help refine your estimate.

Try an example. Make it yours.

Choose a starting project to see an itemized budget instantly. Loading an example replaces project settings; Undo restores your previous entries. Your city and notes stay in place.

Illustrative scenarios based on Mi Tile work. Dimensions and product budgets are examples, not a customer quote or a promise of final cost.

Preliminary budgetAdd known detailsView estimate ↓

1. Where are you starting?

2. Plumbing & electrical changes

Starts with one selected fixture or limited work area. More detail lets you change quantities; saved quantities stay active in either view. If a related trade is checked below, unspecified work uses a stated planning assumption. Explicit “No work” takes priority.

3. Surfaces, tile & installation

Enter square feet or length × width for each surface. Add another area if it has different tile or installation work.

Tile quantities automatically include 20% spare for standard tile or 25% for large-format tile or complex patterns.

Labor uses installed area only. Cutting allowance and whole-box rounding apply only to the tile purchase. Already-tiled surfaces are excluded. Grouting and silicone are separate labor stages, itemized below. Supplies appear as a separate budget allowance.

The quantities above cover selected finish tile. The live estimate itemizes labor, installation supplies and selected additional work separately. Final measurements and carton quantities need review before ordering.

A continuous tile edge around the corner.

Details about mitered edges

Two tile edges are cut at 45° and joined at an outside corner, so the tile appears to wrap around it without a visible metal trim. A clean detail for niches, benches and fireplaces. Tile suitability and exposed corner protection are reviewed first.

Priced per linear foot of finished edge; enter only the edges you want mitered.

Built-in storage, with less clutter in the shower.

Details about shower niches

A recessed niche keeps everyday bottles within reach and leaves the shower floor clear. We plan its height and size around your products, tile layout and wall framing. Custom sizes and lighting are separate choices.

This quantity is for building, waterproofing and tiling a standard niche. Use the prepared-niche field if it is already built.

2. What affects your project?

Choose what you know. “Not sure” is a useful answer too.

Related work you want Mi Tile to coordinate

Warm tile under bare feet, right where you step.

Details about heated floors

Think of stepping onto a comfortably warm bathroom floor on a cool morning. Electric floor warming adds comfort to selected walking areas, with temperature controlled by a compatible thermostat. The usable area and electrical supply are checked before installation.

Select Heated floors to include it. Enter the heated area in the detailed settings; the thermostat / testing stage and system materials are shown separately.

Complete the scope · fixtures, glass & materials

Choose known work. “From selected details” follows the answers and checked trades. Quantities below count remaining work; 0 means not requested. Open Assumptions beside the total to see any defaults used.

A more open shower entrance with a curbless option.

Details about shower bases

A curbless shower removes the raised threshold for a more continuous floor and easier entry. The floor structure, slope, drainage and surrounding waterproofing need to support the design. We confirm feasibility before promising a flush transition.

Choose curbless conversion when wanted. Base construction, tile installation and glass remain separate estimate lines.

Glass sized to fit the shower you designed.

Details about shower glass

A custom enclosure is measured for the finished opening, giving more flexibility in size and layout than a store-bought kit. Panel arrangement, hardware and height affect the final price. Final glass measurements follow completed tile.

Custom packages include glass, fabrication and installation. For a store-bought kit, the product price and installation are separate.

See the room and coordinate choices before construction.

Details about design services

Layouts, drawings, 3D views and coordinated finish selections help you compare the complete room before ordering products. A designer can connect the tile, cabinetry, lighting and fixtures into one plan.

The one-bathroom package has an agreed meeting and revision scope. Product purchases and construction are separate.

Straighter surfaces help the finished room look intentional.

Details about wall preparation

Correcting uneven walls can improve tile alignment and the transitions to adjoining painted surfaces. The amount of correction depends on the existing room; it is a separate service chosen after reviewing the surfaces.

Shower-wall correction and whole-room correction are different options. Select only the scope you need.

Epoxy option: more resistance to everyday stains.

Details about epoxy grout

High-performance epoxy grout offers strong stain resistance and consistent color, helping joints stay easier to maintain. It still needs routine cleaning, and compatibility should be checked with your tile or stone. It does not replace the shower waterproofing system.

Epoxy grout labor is 3× standard grouting; grout material is separate. Natural-stone grouting uses 1.5×. Contrast-color premiums are confirmed separately.

Kitchen fixtures & finishing lengths

Warm the places you actually stand and walk.

Details about heated area

Plan the clear walking area beside the vanity and outside the shower. Fixed cabinets, tubs and other excluded zones should not be counted automatically. Mi Tile confirms the cable layout and compatible system.

The estimate separates heated-area labor, thermostat installation / testing, materials and any new electrical circuit.

Finish an existing niche to match the surrounding tile.

Details about prepared niches

Careful layout inside an already-built niche makes its sides, back and edges work with the shower design. The existing preparation and waterproofing must be suitable to continue.

This option is tile labor for a prepared niche. Do not also count the same niche as a new niche to build.

A clean drain line that can suit your shower layout.

Details about linear drains

A linear drain creates a long, defined drainage detail and can support different tile and slope layouts when designed for the location. Drain placement, waterproofing connection and the selected product need to work together.

The upgrade labor is separate; drain product and any additional plumbing changes must also be included.

A comfortable place to sit or rest a foot.

Details about shower benches

A tiled bench adds a convenient seat for showering and everyday routines. Its size and position should leave enough room to move, with appropriate support, slope and waterproofing.

The standard bench allowance includes building, waterproofing and tiling. Finish tile and unusual sizes are reviewed separately.

Carry the tile finish neatly into the window opening.

Details about window returns

Tiled window returns can make the opening feel integrated with the surrounding wall. Edge treatment, frame compatibility and wet-area waterproofing are planned before installation.

The allowance covers a standard opening; larger or unusual windows need their own review.

Light that highlights the details you chose.

Details about lighting

Accent lighting can bring attention to a niche, shelf or textured surface and create a softer evening atmosphere. Driver location, controls, access and fixtures suitable for the location are planned before closing the wall.

Installation is priced by lighting point. Fixtures, drivers and additional wiring are separate unless entered.

4. Anything else we should know?

BEFORE YOU COMPARE THE TOTALS

Do the estimates cover the same project?

See what each proposal includes, what it leaves out and which costs still need clarification.

Compare my estimates

Estimate comparison checklist

Layout and allowances
Compare the same cabinet layout, countertop area, backsplash coverage and appliance locations.
Trade work
Check demolition, disposal, plumbing, electrical changes and wall repair.
Supply and installation
Separate cabinetry, fabrication, templates, delivery, installation labor and finish materials.
Allowances and changes
Mark each item as included, an allowance, excluded or unclear. Ask how changes affect the price and schedule.