Loomis, California
What we found below Nancy’s shower window
Glass block enclosed one end of Nancy Young’s bathroom. She wanted a curbless shower and a stone pattern that would run into it from the main floor. The first tiles we took off revealed how much work the window wall needed before the new stone could go in.
Jump to the before-and-after video
BeforeAfterOpening the old shower wall
We protected the route through the house and removed the glass-block partition and old tile. The wood beneath the shower window crumbled, and the damage continued along the bottoms of the adjoining walls. We opened those areas far enough to trace the damage, sent Nancy photos of the exposed framing and agreed on the repair with her.
Rebuilding the window wall and lowering the shower floor
We replaced the affected framing and sections of subfloor, repaired the moisture barrier behind the stucco and fixed damaged hardwood in the adjoining room. We reframed the opening for a narrower window and repaired the finishes around it. At floor level, we lowered the base so the slope could start flush with the bathroom floor. We roughed in the shower plumbing and tied the new window into the shower waterproofing.
While the walls were open, we also moved the connections for both sinks and the toilet. Horizontal pipes crossed the openings for Nancy’s recessed medicine cabinets. Lowering and rerouting those pipes left room for both cabinets behind the arched mirrors.
Carrying the star-and-cross stone into the shower
We laid the larger natural-stone pieces across the main floor. Inside the shower, a smaller mesh-mounted mosaic repeats the star-and-cross shapes and follows the slope of the base. We set the textured wall tile vertically around the new window and recessed shelf and finished the exposed edges with matching rounded trim.
Fitting the double vanity and lighting
We installed the countertop on the dark wood vanity, connected both sinks and their brass-toned faucets, and aligned three dimmable sconces with the arched mirrors. We replaced the exhaust fan, updated the outlets and switches, repaired and painted the drywall, finished the baseboards and casing, and refinished the door. Two decorative ceiling beams run above the vanity toward the window.
Watch Nancy’s bathroom change from the doorway
The walkthrough begins with the glass-block enclosure. The camera returns to the window after the shower wall and stone floor are in place.
Homeowner · Principal at The NiVACK Group
“My experience with Mikhail and the Mi tile team was fantastic. Having had a very poor experience with a landscaping contractor earlier, I was nervous about another poor contractor experience. Quite the contrary! Mikhail and team were excellent to work with. There were no surprises and they finished before schedule. Very responsive and patient. I’m very happy with the result!”Five-star Google review, posted as N Young