White Subway Shower With a Long Recessed Shelf

El Dorado Hills

Preparing the curb and long recess

The high window leaves the adjoining wall open for a long storage shelf. The preparation photograph shows the backer-board seams, the full length of the recess and the orange shower base at the curb in one view.

Prepared shower walls and a partially covered orange base below the high window.
Prepared shower walls and a partially covered orange base below the high window.
The high window remains open during the wall preparation. A continuous band marks the long recess on the adjoining wall.
Preparing the Wall Below the High Window

Running the subway tile beneath the window

White rectangular tile carries across the end wall below the window and around the corner. The long shelf creates a second horizontal edge on the adjoining wall. Keeping the courses aligned made the changing wall depths easy to read.

White subway tile continues beneath the high window while the upper part of the shelf wall is still open.
White subway tile continues beneath the high window while the upper part of the shelf wall is still open.

Finishing the boundary at the curb

Large dark hexagons fill the shower base and meet a light curb at the entrance. From above, the grout lines and square drain are easy to locate. The same dark floor outside the curb brings the two tile surfaces close in color.

Dark hexagonal floor tile meets the pale curb, with the square drain visible inside the shower.
Dark hexagonal floor tile meets the pale curb, with the square drain visible inside the shower.
The long recess runs along the side wall, above a dark shower floor and a light-colored curb.
White Shower Walls and a Long Recessed Shelf

Project on Instagram