Jacob’s whole-home remodel
One wood-look porcelain floor connects the main rooms of Jacob’s home. We carried it into the primary shower, rebuilt two tub bathrooms, opened a home theater and finished the walls and ceiling of the double-height living room.
A wood-look porcelain floor through the house
Moving interior walls changed where the rooms and hallways met. Once the partitions were in place, we leveled the subfloors and laid a Schluter uncoupling membrane. In the hall, the orange edge of the membrane is still visible beside the first runs of tile.
We carried 9-by-48-inch wood-look porcelain through the doorways in staggered rows. Planning the row direction and cuts across more than one room kept the joints aligned at the openings. Light from the windows picks out the long edges of the planks in the finished floor.
Ocean-blue tile around the tub and doorway
In this bath, a warm vein crosses the blue-gray porcelain behind the dark tub fittings. The same tile wraps the doorway. We rebuilt and flattened the walls, waterproofed the wet area with GoBoard and Schluter materials, and selected the order of the 24-by-48-inch panels before setting them.
At the corner behind the tub, the pattern turns onto a return wall with two recessed shelves. We cut the exposed tile edges at 45 degrees so the faces of the niches and the adjoining wall meet in porcelain. The sandy tone of the floor picks up the warmer colors in the wall tile.
Stacked niches beside the handheld shower
In the other tub bath, the stacked niches share a wall with the handheld shower. From the tub, the dark hose is on the left and the two shelves are on the right. The opened walls gave us access to the framing before we closed and waterproofed the surround.
We flattened the walls for the 24-by-48-inch porcelain and dry-planned the veining across the large faces. GoBoard and Schluter materials protect the wet area behind the tile. At the two shelf openings, 45-degree mitered returns carry the porcelain into each recess.
A curbless primary shower and freestanding tub
A glass-block partition and a corner tub divided the original bathroom. Reworking two small compartments gave the suite a more open layout and made space for towel storage. We coordinated the drain and finished floor heights before setting the curbless shower. The wood-look floor now continues through the ceiling-height glass enclosure.
The 24-by-48-inch blue-gray porcelain runs up the shower walls and across its ceiling. We waterproofed the enclosure, mitered the exposed corners and used tile at the doorway transitions. The remodel also included new plumbing and electrical for a jetted tub and a new exhaust fan. The freestanding tub sits against the same veined tile.





Building the home theater around its sound system
Removing interior partitions enlarged the theater enough for a snack area with a sink. While the walls were open, we ran the new plumbing and electrical and concealed the wiring for speakers in both the walls and the ceiling.
After the wiring was in, we leveled and retextured the wall surfaces and painted the room black. Along the bank of windows, daylight shows the same wood-look porcelain that runs through the brighter living spaces.
Finishing the walls and double-height living room
The floors were already tiled when the drywall work began. We covered the porcelain before patching, sanding and texturing the walls and ceilings throughout the house. In the living room, that surface work extended to a 20-foot ceiling.
The wiring and plumbing had gone into the open walls earlier in the remodel. With those surfaces closed, we finished the paint, fitted the trim and baseboards, and completed the lighting and ventilation adjustments. The final film follows the high windows and finished floor through the living space.

Jacob’s experience
“They replaced all the flooring with beautiful porcelain tile and completely remodeled the bathrooms.”
Jacob Hilderbrand
Read Jacob’s full reviewYour next chapter
Let’s make the next step clear.
Send a few photos of your space and tell us what you want to change. We’ll help identify the right scope and what needs to be decided first.








