Shower Repair & Replacement

MI TILE · Shower repair & replacement · Greater Sacramento

A shower problem needs
an explanation before a solution.

Water outside the shower. Grout that keeps cracking. A floor that never seems to drain. We help identify what is happening, what can be repaired and when rebuilding the concealed assembly is the more dependable path.

01 / What brought you here?

Start with the symptom.
Then look beyond it.

The same visible problem can have different causes. A photo starts the conversation; it does not prove what is behind the tile.

Water appears outside the shower

Useful to show: the whole shower and the first place water appears.

We look at when it happens, where it travels, the entry, glass details, drain and nearby plumbing. Escaping spray, poor drainage and a concealed leak need different responses.

The floor holds puddles

Useful to show: standing water and the drain location.

We check the route toward the drain, local low spots and changes at the entry. A raised area or reverse slope can trap water even when the drain itself is working.

Grout or silicone keeps failing

Useful to show: close-ups plus a wide view for context.

We examine movement, changes of plane, drainage and the condition of adjacent materials. Replacing a joint may be appropriate, but repeated failure deserves an explanation.

The work is unfinished or feels wrong

Useful to send: progress photos and the original scope.

We review what has already been installed, product information and construction photos. This is the time to clarify the remaining work before glass, tile or trim makes corrections harder.

Large gray tiles, dark accent band and mosaic shower floorRed waterproofing on the three shower wallsWaterproofingTile complete
Look past the low partition to see how the waterproofed walls were finished.Drag to compare.

02 / What the finish cannot tell you

Beautiful tile is not
the waterproofing.

The water-management system lives behind and beneath the surface.

A continuous waterproof layer

Walls, floor, corners, niches, benches and penetrations need compatible connections—not a collection of unrelated products.

A drain connection that belongs to the system

The drain and waterproofing need to meet correctly. A neat-looking grate does not show that connection.

A route for water to leave

The floor, entry and horizontal surfaces should direct water where it belongs.

A visual review can identify visible concerns and questions to investigate. Concealed construction may require records, testing or a targeted opening before we can define the repair.

03 / Choose the right amount of work

Repair, open a limited area,
or rebuild?

Our aim is a scope that addresses the cause without promising a small cosmetic repair will solve an unknown concealed problem.

A / LOCAL REPAIR

When the issue is genuinely isolated

A limited joint, fitting or damaged tile may be repairable when the surrounding assembly is suitable and the repair does not compromise waterproofing. We define the limits of that repair before proceeding.

B / TARGETED INVESTIGATION

When the evidence is incomplete

A controlled opening or suitable test may answer a specific question. We agree what we are trying to confirm, what must be disturbed and what happens if the exposed condition changes the scope.

C / SHOWER REBUILD

When a dependable repair needs a continuous system

Widespread deterioration, unsuitable slopes or waterproofing that cannot be reliably tied into may call for rebuilding the affected assembly. This can also be the opportunity to improve the entry, storage and daily comfort.

04 / A lesson from shower evaluations

Glass cannot fix
the floor beneath it.

A shower can look ready for its enclosure before it is ready for water.

During a visual evaluation, uneven drainage and a raised area at a curbless entry can be more significant than the missing glass. Adding an enclosure will not remove a hump, reverse a slope or establish a hidden waterproofing connection.

We resolve the drainage and entry plan before final glass measurements. That prevents an expensive enclosure from becoming an obstacle to the work the shower still needs.

Before something gets covered

01

Document the opened condition

Review damage, framing, substrate and plumbing locations.

02

Confirm the assembly

Agree the drain, entry, waterproofing system and details at niches or benches.

03

Check before tile

Complete the system’s required curing, waterproofing checks and appropriate water test before the finish hides the work.

04

Finish, measure, protect

Complete tile and joints, confirm glass dimensions from finished surfaces and explain when the shower can be used.

Paint damage and deterioration at a baseboard beside a shower
A damaged edge near the shower deserves a moisture review before a cosmetic repair.

AN EDGE WORTH PLANNING

A bathroom baseboard
does not have to be wood.

Painted wood and MDF can deteriorate when repeatedly exposed to water. Tile baseboards can give a bathroom or utility area a more water-resistant, coordinated perimeter.

We agree the height, top edge, inside and outside corners, door-casing transitions and flexible junction at the floor. Choose matching tile, a purpose-made trim or an appropriate edge profile.

First, solve the water source. Tile baseboards do not repair a leaking shower or replace the room’s waterproofing details.

MATERIALS THAT WORK TOGETHER

An upgrade still needs
to suit your tile.

Epoxy is a choice, not a universal answer.

It can offer useful stain resistance and durability, but the tile and grout manufacturers must approve the combination. Some translucent glass products have restrictions on epoxy grout in wet locations.

We confirm compatibility, sample appearance and cleaning requirements before pricing the upgrade. Natural stone, textured tile and strong color contrast may need additional care.

The joint matters as much as the grout.

Changes of plane, perimeters and other movement locations need the specified flexible detail. Grouting every junction rigidly can create avoidable problems.

For a leaking shower, fresh grout or silicone is not automatically a complete repair. We first establish the source and the condition of the assembly.

05 / Make the rebuild work better for you

Comfort is planned early.

These decisions affect the hidden construction as much as the finished appearance.

EASIER ENTRY

A curbless shower that actually drains

Floor depth, drain position, surrounding room levels and waterproofing determine what is feasible. Removing a curb is not the entire conversion.

USEFUL STORAGE

A niche where you can reach it

Plan bottle sizes, framing conflicts and the tile layout together. A bench also needs its support, slope and waterproofing resolved.

A CLEAN FINISH

Edges and glass considered together

Choose trims or mitered edges before tile is set. Plan glass attachment and door clearance before the final measurements.

06 / Scope & budget

See what is included.
See what remains unknown.

Demolition, hauling, substrate repair, waterproofing, tile, grout, silicone and glass are different parts of the work.

Plumbing changes, a new valve, hidden damage and finish materials can materially change the total. We list them deliberately instead of letting “shower replacement” stand in for an undefined package.

If you want a second opinion before choosing the repair, start with Mi Audit My Remodel.

Questions we hear

Can new grout or sealer stop a leak?

They can address some surface maintenance needs, but they do not replace a failed waterproofing system or repair a plumbing leak. We first determine why water is escaping.

Does missing construction documentation prove the work is wrong?

No. It means an important question remains unverified. Product details, progress photos or testing can help establish what was done; an opening may be needed when the concealed condition matters to the repair.

Can we keep the existing glass?

Sometimes. Its size, condition, attachment points and the new finished dimensions must work together. A change in tile thickness, curb or layout can prevent reuse, so we check before designing around it.

Can you finish a shower another installer started?

We can review the remaining scope and existing work. Any correction needed to support the new installation is identified first, along with what can and cannot be verified without opening the assembly.

Explore the technical guides behind these decisions

Product-specific instructions determine the final assembly. These references explain the planning principles shown above.

THE LAYERS YOU DO NOT SEE

A clear path for water.
A connected system underneath.

A beautiful shower should also make sense. These three views show where the water goes, what supports the floor, and how the hidden connections are protected.

01 / HOW A CURBLESS SHOWER WORKS

No step at the entrance.
A slope inside the shower.

The bathroom floor meets the shower smoothly. Inside, the floor falls toward the drain. The entry, spray direction, glass and drainage are planned together.

How a curbless shower directs water to the drainSide section: a level bathroom floor meets the shower without a raised curb. Inside the shower the tiled surface and waterproofing slope downward to a connected drain. A side glass panel controls splash. BATHROOMSHOWER Side glass 1234
Side section. Slope and layer thicknesses are exaggerated for clarity. The glass shown is beside the entry, not across the walking path.
  1. 1
    A smooth entry

    The finished surfaces meet without a raised curb. Floor heights are resolved before the tile goes down.

  2. 2
    Water moves toward the drain

    The shower floor slopes into the wet area. A curbless shower is not a flat extension of the bathroom floor.

  3. 3
    A connected drain

    Waterproofing meets a compatible drain assembly. Drain position and capacity are selected for the shower layout.

  4. 4
    Continuous waterproofing

    Protection runs below the tile and through the required floor, wall and entry connections—not just along the visible grout lines.

Control the splash

Glass size, showerhead position and the open entrance are coordinated so the spray is not aimed at the bathroom.

Test before tile

The completed waterproofing is water-tested before it is covered, following the system requirements. The curbless opening is temporarily dammed for the test.

Keep the drain clear

Access for cleaning is part of the design. Hair and debris still need removal so drainage can work as intended.

We check your existing floor depth and structure first, then explain the available entry and drainage options for your room.

02 / WHAT IS UNDER THE SHOWER

The space for a smooth entry
starts below the tile.

This Schluter example shows a recessed wood subfloor, a sloped shower tray, and waterproofing connected to the surrounding floor.

Side section showing the bathroom floor meeting a sloped shower tray over a recessed wood subfloor
The waterproofing follows the transition from the bathroom into the shower.
Explore the layers in this floor assembly
  1. 1
    Thin-set mortar

    Bonds the specified layers together.

  2. 2
    Solid wall backing

    Provides support for the wall waterproofing.

  3. 3
    KERDI waterproofing membrane

    Creates the bonded water barrier beneath the finish.

  4. 4
    KERDI-BAND at connections

    Seals specified seams and changes of plane.

  5. 5
    Sloped shower tray

    Builds the fall toward the drain into the shower floor.

  6. 6
    Recessed shower subfloor

    Creates room for the shower assembly below the entry level.

  7. 7
    Existing subfloor

    Supports the surrounding bathroom floor.

  8. 8
    DITRA / DITRA-XL membrane

    Connects the floor assembly to the waterproofed shower transition using the specified details.

  9. 9
    Support ledgers

    Support the recessed subfloor between the joists.

  10. 10
    Blocking

    Provides the required support at the floor framing.

The practical question: can this room accommodate the required floor build-up? We assess that before promising a curbless entry. Changes to structural framing require a suitable design; cutting joists is not the default solution.

System reference · Schluter-Systems, Shower System Installation Handbook, curbless wood-floor detail.

03 / WALLS, SEAMS & DRAIN CONNECTIONS

A waterproof board.
Every connection completed.

GoBoard provides a waterproof core. Seams, fasteners, corners and pipe openings are then sealed using the selected system’s installation details.

The layers of a waterproof shower wallSeparated illustration showing framing, waterproof GoBoard with sealed joints and fasteners, compatible tile-setting mortar, and finished tile. 1234
Exploded wall view: layers are separated to show their roles. Actual installation follows the specified board, mortar and waterproofing system.
  1. 1
    Straight, stable framing

    Wall support and alignment are checked before boards are installed.

  2. 2
    GoBoard + sealed connections

    The waterproof board works together with sealed joints, fasteners, corners and penetrations.

  3. 3
    Compatible tile-setting mortar

    Bonds the tile to the prepared board with the required support and coverage.

  4. 4
    Tile + finished joints

    Creates the visible surface. The waterproofing behind it remains a separate, essential layer.

Exploded view of the GoBoard grate, adjustable riser, clamping collar, membrane and drain body

The grate is only the visible part.

The membrane must connect to the correct drain assembly below it. We also plan the seals at the mixing valve and shower arm before closing the wall.

System reference · Johns Manville, GoBoard Step-by-Step Guide. Each diagram explains its own system; parts are not interchangeable by default.
What about purple drywall or a membrane over a wall board?

Color alone does not identify a waterproof shower assembly. Ordinary moisture-resistant drywall is different from a specified shower tile backer. Some approved systems use a membrane over an allowed substrate, including gypsum in specified KERDI assemblies.

We confirm the exact product and complete assembly. On a new build, agreeing on the wet-zone backing before drywall can avoid paying for installation and removal of an unsuitable board.

How does this differ from a traditional liner or hot-mop pan?

A bonded waterproofing system places the water barrier directly beneath the tile-setting layer and connects it to a compatible drain. A properly built traditional pan uses a sloped liner beneath a mortar bed, with a compatible drain and protected weep paths.

The inspection question is whether the selected system was built correctly. Moisture in a traditional mortar bed alone does not prove a leak; slope, waterproofing and drain connections need to be evaluated together.

COORDINATE BEFORE CLOSING THE WALL

A calm-looking shower
starts with a clear layout.

Front view showing the ceiling light, showerhead, valve control and floor drain on a shared centerline

Visible details, coordinated together

From the entrance, the ceiling light, showerhead, valve control and floor drain line up from top to bottom. We mark their centers with a laser before the walls close.

We check the floor slope, framing and pipe route against that layout while adjustments are still possible.

Photograph the hidden work.

Confirm pipe support, movement allowances, required nail / screw protection and accessible service points. Keep photos before the wall is closed, then verify the waterproofing around each penetration.

Two tile niches with mitered edges
Agree niche height, shelf spacing, tile joints and edge finish together. Sloped horizontal surfaces help water return to the shower.
Shower niche sizes, tall three-compartment niches, and a five-foot wall-to-wall niche with an optional mirror; unlit and LED options
Choose the shelf height around your tallest bottle. A wall-to-wall niche can include a mirror for shaving. For optional LED lighting, we plan the wiring and access to the driver before closing the wall.

BEFORE YOU BUY

A tile you love.
A batch that works.

Send us the tile models you like. We help check the practical details before you commit: the actual batch, available quantity, edge condition and suitability for the location.

Read more than the product name

Keep the carton label.

Product / SKU
The selected model
Shade / dye lot
Compare across cartons
Caliber / size code
Confirm a match
Production lot
Check batch availability

Label names vary by manufacturer. A changed code is a reason to ask before mixing boxes.

  1. Check the actual tile

    Review samples from the batch: dimensions, squareness, bowing, thickness, visible chips and the cut edge. Compare concerns with the manufacturer’s stated tolerances.

  2. Reserve enough together

    Confirm usable stock from a consistent shade and caliber, including the agreed cutting allowance and spare tiles. A matching product name does not guarantee a matching batch.

  3. Protect it on the way home

    Look for sound cartons and protected edges. Corner guards are helpful when supplied. Record transit damage and inspect delivered tile again before installation.

Variation or a problem? Know what you are looking at.

Some tiles are deliberately varied in tone, pattern or texture. We review several pieces together and blend approved cartons during installation. Caliber differences, excessive distortion or damage need a separate decision before the tile is installed.

Rectified tile still has manufacturing tolerances. Leveling clips cannot make an unsuitable batch flat, and shipping damage should not be confused with factory warpage. We use the product’s instructions to agree the layout, joint width and an acceptable sample.

What to send the Mi Team

Send the product link, size and finish; photographs of carton labels; the room and intended surface; and any edge trim you are considering. We review the selection and coordinate a store or batch check as part of the agreed project planning.

Keep labels, receipts and a few spare tiles. Report damage promptly and resolve questionable pieces with the supplier before setting them.

FINISH THE EDGE

Choose the corner before
ordering the tile.

01 / Metal profile

A clean, protected edge

Choose the profile depth for the tile and setting system. Coordinate the finish with faucets, hardware or the tile itself.

Standard installation labor is normally included. The selected profile material is purchased separately.

02 / Tile baseboards

Continue the floor tile up the wall

Installation is $25 per linear foot when the baseboard is cut from the floor tile. Other tile, heights or custom profiles are quoted separately. Materials are purchased separately.

03 / 45° miter

The tile turns the corner

Two carefully finished edges create a continuous return. Tile composition, the exposed edge and impact risk guide whether a miter is appropriate.

Miter work is a separate allowance. Measure each finished edge once.

04 / Finished stone edge

Sometimes the material is the finish

Suitable marble or granite can be honed or polished at the exposed edge. Agree the edge profile and a sample; a raw cut is not automatically a finished edge.

Color-body porcelain does not necessarily carry its surface pattern through the body. Check the actual cut before choosing an exposed edge.

Tile baseboards are a separate finish option with their own measured scope. Installation from the same floor tile is $25 per linear foot. Other materials or profiles require a separate quote.

KEEP THE USEFUL PART

Shower planning checklist

Save this list for your project or share it with your contractor. No sign-up needed.

  • Describe the symptom or goal; keep construction photos and note when a leak appears.
  • Agree the layout, entry, valve, showerhead, drain, niche, glass and lighting before rough work.
  • Identify the complete waterproofing system and every seam, fastener and penetration detail.
  • Agree wet-zone backing with the drywall team before walls are boarded.
  • Confirm sloped drainage surfaces and the pan-to-drain connection; document the water test.
  • Review pipe protection and photograph concealed work before closing the wall.
  • Check tile SKU, shade, caliber, batch quantity, geometry, packaging and delivered condition.
  • Choose edge trim, grout, movement joints, tile baseboards and maintenance requirements.
  • For a lit niche, specify the light, driver, controls, wiring route and service access.
  • Record who buys each material, what the estimate includes and how changes are approved.

A clear next step

Show us the symptom.
We will help define the next step.

Send a short description of what happens and when. If the shower is actively leaking, pause its use while the source is assessed.

Helpful to send: a doorway-to-doorway video, the shower floor and drain, the entry, the affected area and any construction photos you already have.

Estimate your showerOpen the calculator when you are ready. Only details for this service.

YOUR PROJECT / PRELIMINARY ESTIMATE

Your project. A clearer starting price.

Start with the details you know. See a preliminary price range for the work entered, what is still missing, and the photos that will help refine your estimate.

Try an example. Make it yours.

Choose a starting project to see an itemized budget instantly. Loading an example replaces project settings; Undo restores your previous entries. Your city and notes stay in place.

Illustrative scenarios based on Mi Tile work. Dimensions and product budgets are examples, not a customer quote or a promise of final cost.

Preliminary budgetAdd known detailsView estimate ↓

1. Where are you starting?

2. Plumbing & electrical changes

Starts with one selected fixture or limited work area. More detail lets you change quantities; saved quantities stay active in either view. If a related trade is checked below, unspecified work uses a stated planning assumption. Explicit “No work” takes priority.

3. Surfaces, tile & installation

Enter square feet or length × width for each surface. Measure the bathroom floor outside the shower separately. A new shower pan starts at 15 sq ft.

Tile quantities automatically include 20% spare for standard tile or 25% for large-format tile or complex patterns.

Labor uses installed area only. Cutting allowance and whole-box rounding apply only to the tile purchase. Already-tiled surfaces are excluded. Grouting and silicone are separate labor stages, itemized below. Supplies appear as a separate budget allowance.

The quantities above cover selected finish tile. The live estimate itemizes labor, installation supplies and selected additional work separately. Final measurements and carton quantities need review before ordering.

A continuous tile edge around the corner.

Details about mitered edges

Two tile edges are cut at 45° and joined at an outside corner, so the tile appears to wrap around it without a visible metal trim. A clean detail for niches, benches and fireplaces. Tile suitability and exposed corner protection are reviewed first.

Priced per linear foot of finished edge; enter only the edges you want mitered.

Built-in storage, with less clutter in the shower.

Details about shower niches

A recessed niche keeps everyday bottles within reach and leaves the shower floor clear. We plan its height and size around your products, tile layout and wall framing. Custom sizes and lighting are separate choices.

This quantity is for building, waterproofing and tiling a standard niche. Use the prepared-niche field if it is already built.

Enter each niche once. Its interior is included in the niche allowance.

2. What affects your project?

Choose what you know. “Not sure” is a useful answer too.

A more open shower entrance with a curbless option.

Details about shower bases

A curbless shower removes the raised threshold for a more continuous floor and easier entry. The floor structure, slope, drainage and surrounding waterproofing need to support the design. We confirm feasibility before promising a flush transition.

Choose curbless conversion when wanted. Base construction, tile installation and glass remain separate estimate lines.

Glass sized to fit the shower you designed.

Details about shower glass

A custom enclosure is measured for the finished opening, giving more flexibility in size and layout than a store-bought kit. Panel arrangement, hardware and height affect the final price. Final glass measurements follow completed tile.

Custom packages include glass, fabrication and installation. For a store-bought kit, the product price and installation are separate.

Related work you want Mi Tile to coordinate

Warm tile under bare feet, right where you step.

Details about heated floors

Think of stepping onto a comfortably warm bathroom floor on a cool morning. Electric floor warming adds comfort to selected walking areas, with temperature controlled by a compatible thermostat. The usable area and electrical supply are checked before installation.

Select Heated floors to include it. Enter the heated area in the detailed settings; the thermostat / testing stage and system materials are shown separately.

Complete the scope · fixtures, glass & materials

Choose known work. “From selected details” follows the answers and checked trades. Quantities below count remaining work; 0 means not requested. Open Assumptions beside the total to see any defaults used.

Storage and proportions that suit the room.

Details about cabinet installation

Custom or recessed cabinetry can make better use of the available space and support the look you want. Dimensions, drawer clearances and plumbing are planned together. A ready-made vanity can suit a simpler project.

Custom cabinet fitting / installation is an allowance; cabinet fabrication and purchase are separate.

Straighter surfaces help the finished room look intentional.

Details about wall preparation

Correcting uneven walls can improve tile alignment and the transitions to adjoining painted surfaces. The amount of correction depends on the existing room; it is a separate service chosen after reviewing the surfaces.

Shower-wall correction and whole-room correction are different options. Select only the scope you need.

Epoxy option: more resistance to everyday stains.

Details about epoxy grout

High-performance epoxy grout offers strong stain resistance and consistent color, helping joints stay easier to maintain. It still needs routine cleaning, and compatibility should be checked with your tile or stone. It does not replace the shower waterproofing system.

Epoxy grout labor is 3× standard grouting; grout material is separate. Natural-stone grouting uses 1.5×. Contrast-color premiums are confirmed separately.

Fixture quantities & finishing lengths

Warm the places you actually stand and walk.

Details about heated area

Plan the clear walking area beside the vanity and outside the shower. Fixed cabinets, tubs and other excluded zones should not be counted automatically. Mi Tile confirms the cable layout and compatible system.

The estimate separates heated-area labor, thermostat installation / testing, materials and any new electrical circuit.

Finish an existing niche to match the surrounding tile.

Details about prepared niches

Careful layout inside an already-built niche makes its sides, back and edges work with the shower design. The existing preparation and waterproofing must be suitable to continue.

This option is tile labor for a prepared niche. Do not also count the same niche as a new niche to build.

A clean drain line that can suit your shower layout.

Details about linear drains

A linear drain creates a long, defined drainage detail and can support different tile and slope layouts when designed for the location. Drain placement, waterproofing connection and the selected product need to work together.

The upgrade labor is separate; drain product and any additional plumbing changes must also be included.

A comfortable place to sit or rest a foot.

Details about shower benches

A tiled bench adds a convenient seat for showering and everyday routines. Its size and position should leave enough room to move, with appropriate support, slope and waterproofing.

The standard bench allowance includes building, waterproofing and tiling. Finish tile and unusual sizes are reviewed separately.

Carry the tile finish neatly into the window opening.

Details about window returns

Tiled window returns can make the opening feel integrated with the surrounding wall. Edge treatment, frame compatibility and wet-area waterproofing are planned before installation.

The allowance covers a standard opening; larger or unusual windows need their own review.

Light that highlights the details you chose.

Details about lighting

Accent lighting can bring attention to a niche, shelf or textured surface and create a softer evening atmosphere. Driver location, controls, access and fixtures suitable for the location are planned before closing the wall.

Installation is priced by lighting point. Fixtures, drivers and additional wiring are separate unless entered.

4. Anything else we should know?

BEFORE YOU COMPARE THE TOTALS

Do the estimates cover the same project?

See what each proposal includes, what it leaves out and which costs still need clarification.

Compare my estimates

Estimate comparison checklist

Repair or rebuild
Do both proposals cover the same walls, pan, curb and connection to the existing shower?
Preparation and drainage
Compare removal, backing, waterproofing, drain connection and testing.
Installation and purchases
Check valve and trim installation labor, who supplies the fixtures, and whether tile, glass and edge work are included.
Allowances and changes
Mark each item as included, an allowance, excluded or unclear. Ask how changes affect the price and schedule.